NASA just fueled up its Artemis 2 moon rocket in 2nd critical test. Was it a success? (It sure looked like it.) - Space
Summary Full Article
NASA successfully completed the second wet dress rehearsal for its Artemis 2 mission on February 19, loading 730,000 gallons of supercold propellant into the Space Launch System rocket without the hydrogen leaks that plagued both the first Artemis 2 rehearsal and the Artemis 1 mission. This test brings NASA closer to launching four astronauts on humanity's first crewed mission beyond low Earth orbit since 1972, potentially as early as March 6-11. The successful seal replacement and fueling test are critical milestones for keeping the mission on schedule after previous delays threatened to derail the Artemis program's timeline.
Second-Order Effects
Near-term consequences — what happens next
- **Contractor confidence and procurement decisions**: The successful resolution of the recurring hydrogen leak issue at the tail service mast interface will likely strengthen NASA's confidence in its primary contractors (Boeing for SLS core stage, Aerojet Rocketdyne for engines) and validate current engineering approaches, potentially accelerating contract extensions for Artemis 3 and beyond while reducing pressure for alternative launch vehicle considerations.
- **International partner commitment and resource allocation**: A March launch window success would reinforce commitments from international partners, particularly the Canadian Space Agency (with astronaut Jeremy Hansen aboard) and ESA, leading to increased budget allocations and personnel assignments for subsequent Artemis missions and the Lunar Gateway station planned for the late 2020s.
- **Commercial lunar economy acceleration**: Demonstrating that NASA can reliably execute crewed deep-space missions on schedule will catalyze private sector investment in lunar infrastructure, landers, and services, as companies like SpaceX, Blue Origin, and Axiom Space gain confidence that NASA's timeline for establishing sustained lunar presence is credible and worth aligning their development schedules with.
Third-Order Effects
Deeper ripple effects — longer-term consequences
- **Geopolitical space race intensification with China**: A successful Artemis 2 mission would place the United States firmly ahead in the contemporary lunar race, potentially accelerating China's timeline for its own crewed lunar landing (currently planned for 2030) and triggering increased Chinese space budget allocations, creating a new Cold War-style dynamic focused on lunar resource claims and permanent base establishment that could reshape international space law.
- **STEM workforce pipeline transformation**: The first crewed deep-space mission in over 50 years, especially with diverse crew representation (including the first woman and first Black astronaut to leave Earth orbit), will likely trigger a measurable surge in aerospace engineering enrollments beginning in 2025-2026, similar to the Apollo effect, helping address the current U.S. shortage of specialized aerospace talent needed for sustained lunar and Mars programs.
- **Liquid hydrogen infrastructure investment renaissance**: Resolving the LH2 leak challenges and proving its viability for crewed deep-space missions will justify continued heavy investment in hydrogen fuel technology and infrastructure, potentially influencing terrestrial energy policy by demonstrating hydrogen handling capabilities at scale, thereby strengthening the case for hydrogen as a clean energy carrier in aviation and heavy industry despite current efficiency concerns.
Sign in to bookmark stories, take notes, and track action items.